Project Manager & AI Exercises

Fill in the blanks to test your knowledge.

1

The PM role is splitting into an administrative layer (being automated) and a ___ layer (becoming more important) — PMs must invest in the second

Stream 1 — Administrative: status reports, plans, RAID logs. AI is compressing this work.

Stream 2 — : stakeholder navigation, team motivation, decision-making. This is becoming more valuable.

Strategy: use AI for Stream 1 to free up time for Stream 2.

2

Status report AI output quality depends entirely on the quality of the raw ___ the PM provides — specific facts, not polished prose

Wrong input: "Things went okay this week."

Right input: specific raw — actual events, numbers, named issues, explicit flags.

Example: "SAP integration needs 6 weeks not 4 — flag this as HIGH risk."

Result: 90-minute manual report becomes a 20-minute AI-assisted report.

3

The scheduling technique that models optimistic, realistic, and pessimistic delivery dates based on which risks materialize is called ___-adjusted scheduling

-adjusted scheduling models three scenarios:

- Optimistic: everything goes as planned

- Realistic: the two most likely risks materialize

- Pessimistic: three highest-impact risks materialize simultaneously

Benefit: makes schedule uncertainty visible to decision-makers rather than hiding it in a single deterministic date.

4

An escalation email must always include the specific ___ needed from the executive and the deadline for that decision

An effective escalation email includes:

1. A direct statement of the issue (no alarming language)

2. Quantified impact

3. Options with honest pros and cons

4. A recommendation

5. The specific needed from the executive, with a deadline

Goal: the executive has the information to act — not to panic.

5

When a risk becomes an issue, AI-assisted ___ cause analysis prevents the same class of problem on future projects

cause analysis for issues:

1. Identify what caused the issue (list possible causes)

2. Determine which cause is most likely

3. Ask: what should have been done during planning to detect this?

4. Ask: what process change prevents this class of risk in future?

AI structures the analysis — the PM validates with organizational context.

6

The stakeholder communication format that converts raw meeting notes into decisions, action items with owners, and open items is called ___ minutes

minutes convert raw notes into:

- Decisions made

- Action items with an owner and a due date

- Open items requiring follow-up

AI prompt: "Convert these meeting notes to structured minutes. Do not editorialize — only include what is in the notes."

Time advantage: 30-45 minute manual task becomes 5 minutes AI-assisted.

7

When AI coding tools increase development velocity, the project bottleneck shifts from implementation to ___ clarity and QA coverage

Before AI tools: implementation was the constraint — developers needed more time.

After AI tools: clarity is the constraint — is the specification good enough for AI to implement correctly?

Implications: invest more in BA requirements quality and QA capacity.

Caution: traditional estimates based on pre-AI velocity may no longer be accurate.

8

The communication plan that addresses user fears, training, go-live support, and post-go-live feedback for a project that changes how people work is called a ___ management communication plan

A management communication plan covers four phases:

1. Pre go-live: awareness building, addressing fears

2. Training announcement and approach

3. Go-live week communications

4. Post go-live support and feedback channel

AI value: draft all phases simultaneously — the PM reviews and adapts.